日本一区二区三区在线看-日本一区二区三区在线观看-日本一区二区三区在线播放-日本一区二区三区在线 视频-日本一区二区三区有限公司-日本一区二区三区四区视频

行業(yè)資訊

DHK型快速環(huán)鏈電動葫蘆,使用規(guī)則

DHK型快速環(huán)鏈電動葫蘆 ,使用規(guī)則。適用場所設(shè)備制造、生產(chǎn)加工、倉儲物流、船塢碼頭等。

快速環(huán)鏈電動葫蘆

1、使用前必須對吊鉤、鏈條、吊銷等部件進行檢查,確認機件完好無損后,方可使用。

2、使用時,必須確認被提升物不得超過產(chǎn)品額定起重量,也不能用兩臺產(chǎn)品同時提升一件物品。

3、提升重物前,起重鏈條應(yīng)自然垂直懸掛,不得斜吊,雙行起重鏈條產(chǎn)品,下吊鉤嚴禁在兩行鏈中翻轉(zhuǎn),重物提升高度不得超過額定起重高度。

4、提升重物時,嚴禁工作人員在重物下面做任何工作或行走。

5、電源電壓,頻率必須符合銘牌上面的規(guī)定,在額定功率下,電壓不得低于額定值的90%。

6、產(chǎn)品應(yīng)避免雨淋,也不適合于提升有毒、有腐蝕、高溫高壓、易燃易爆的物品,工作環(huán)境應(yīng)符合:溫度-25℃+40℃,濕度<90°。

7、產(chǎn)品當用于腳手架整體提升時,應(yīng)有專人安裝、操作,懸掛結(jié)束后,應(yīng)由空載試運行,檢查各連接件、起重鏈、吊鉤等有無異常,確認完好后在使用。掛架前應(yīng)調(diào)整起重鏈條的長度,使掛架后每臺電動葫蘆的起重鏈條的張緊度一致,提升時,應(yīng)有專人觀察每臺產(chǎn)品,查看腳手架是否與墻體相碰。提升機是否有異常聲音或卡鏈,發(fā)現(xiàn)異常應(yīng)立即停機檢查,排除故障后,方可使用。

DHK type fast chain electric hoist, rules of use

1. Before use, check the hook, chain, revocation and other parts, and confirm that the parts are intact before use.

2. When using, it must be confirmed that the lifting object shall not exceed the rated lifting weight of the product, and it is not allowed to lift one object with two products at the same time.

3. Before lifting heavy objects, the lifting chain shall be naturally suspended vertically without inclined lifting. Double row lifting chain products are prohibited.

4. When lifting heavy objects, it is strictly prohibited for staff to do any work or walk under the heavy objects.

5. The power supply voltage and frequency must meet the requirements specified on the nameplate, and the voltage shall not be lower than 90% of the rated value at the rated power.

6, the product should avoid the rain, also not suitable for ascension toxic, corrosion, high temperature and high pressure, inflammable and explosive items, work environment should meet: temperature 25 ℃ + 40 ℃, humidity < 90 °.

7. When the product is used for the overall hoisting of the scaffold, it shall be installed and operated by a special person. After the suspension, it shall be carried out no-load test run to check whether there is any abnormality in the connecting parts, lifting chain and lifting hook, etc., and it shall be put into use after being confirmed intact. The length of lifting chain shall be adjusted before the hanger to make the tension of lifting chain of each electric hoist behind the hanger consistent. When lifting, special personnel shall observe each product to check whether the scaffold touches the wall. If there is any abnormal sound or card chain in the elevator, stop the machine to check if there is any abnormal sound or card chain.




主站蜘蛛池模板: 99视频九九精品视频在线观看 | 幻女free性摘花第一次 | 毛毛片在线 | 貂蝉沦为姓奴小说 | 狠狠色成人综合网图片区 | a天堂在线视频 | 国产精品欧美日韩一区二区 | 91精品国产品国语在线不卡 | 99er在线视频| 欧美美女被艹 | 暖暖视频免费观看视频中国.韩剧 | 亚洲男人天堂影院 | 美女脱了内裤张开腿亲吻男生 | 精品一区二区三区中文 | 欧美成人香蕉在线观看 | 爆操萝莉 | 女人狂吮男人命根gif视频 | 日本中文字幕在线视频站 | 猛h辣h高h文湿重口 门房秦大爷在线阅读 | 91大神在线精品视频一区 | 亚洲午夜精品久久久久久人妖 | 精品久久久久久国产91 | 小SAO货叫大声点妓女 | xxxx俄罗斯大白屁股 | 国产成人免费观看在线视频 | 成年私人影院免费视频网站 | 成人网18免费网 | 天码毛片一区二区三区入口 | 国产靠逼视频 | 超兴奋朋友的中文字幕下 | 国内精品哆啪啪 | 成年人免费看的视频 | 国产成人一区二区三区在线视频 | 91久久色| 亚洲精品在线免费 | 全弄乱纶小说 | 1024免费福利永久观看网站 | 黑人巨大精品战中国美女 | 欧美久久天天综合香蕉伊 | 男人好大好硬好爽免费视频 | 欧美一级片免费看 |